Pre-Production Manufacturing Readiness Review

A decision gate before tooling, supplier lock-in, or geometry freeze.


Intro

If you’re 2–6 weeks from an irreversible commit, Morfi Review exists to answer one question:

Are you actually ready to proceed — or are you about to hard-wire expensive failure into the product?

This is not design execution.
It is a short, structured review that surfaces manufacturing and assembly risks while you still have time to fix them.

Best fit for

  • Hardware teams approaching tooling / production spend
  • Products with CAD largely stable and a working BOM (even if rough)
  • Teams with uneven internal confidence or unresolved disagreements
  • Situations where the cost of being wrong is material (cash, time, credibility)

Not a fit if

  • Concepts are still moving
  • Manufacturing approach is undefined
  • You want additional CAD capacity or development partner

Outcome

You leave with a ranked risk register, a traffic-light readiness verdict, and a clear proceed / pause / redesign recommendation—written so a VP Eng, COO, or investor can act on it.

Typical fee: £7,500–£12,000 (scope-dependent)